PILOT SERVICE CENTER
Pilot Travel Center, Lamar, CO – Ground up build of a truck stop and travel center with a Dunkin’ Donuts and a PJ Fresh restaurant, showers, truck and auto fueling, CAT scale and a DEF pump building. Completed all the electrical for the fueling and building in a four month period from start to finish.
SKECHERS
Skechers, Castle Rock, CO – Tenant finish of a shoe store from a bare bones store. Full electrical installation including new lighting, switchgear and 480v-208v transformer as well as new lighting control system for interior and exterior.
SNOOZE
Snooze, Westminster, CO – Tenant finish from a new core and shell. Full electrical installation for a breakfast restaurant, including interior and exterior lighting, kitchen equipment, general receptacles, fire suppression system, and HVAC equipment.
FUZZY’S TACOS – CENTENNIAL
Fuzzy’s Tacos, Centennial, CO – Tenant finish from a new core and shell. Full electrical installation for a taco restaurant with low-volt lighting control system, including lighting fire suppression system, HVAC equipment and general purpose receptacles.
FUZZY’S TACOS – DENVER
Fuzzy’s Tacos, Denver, CO – Tenant finish from a new core and shell. Full electrical installation for a taco restaurant with low-volt lighting control system, including lighting fire suppression system, HVAC equipment and general purpose receptacles.
DOUBLETREE
Doubletree, Denver, CO – Remodel of a 300 room hotel. Remodel of rooms and commons areas. New lighting throughout the interior as well as a new fitness center, relocated the electrical room, remodel of the conference rooms, remodel of the hotel restaurant and a Starbucks Coffee shop, installed a new lighting and low voltage lighting system in the ballroom. Four month job duration.
MARCOS’ PIZZA – ARVADA
Marco’s Pizza, Arvada, CO – Tenant finish of a new pizza restaurant. Coordinated directly with the owner of the restaurant to make sure all of the electrical was up to code and provided assistance with ordering lighting and equipment. Full electrical installation.
CASTLE TIRE – SEDALIA
Castle Tire, Sedalia, CO – Disconnected all electrical for a tire recycling facility with its operations outside and rebuilt the electrical system in a new location indoors. Ran new conduit and set new disconnects as well as set up the motor control center and re-wired and programmed the PLC. 7 motors including a 250 hp tire shredder. Designed a start and emergency stop system to work with the PLC. Completed this in 5 calendar days.